MOMO | Flight 3

Flight duration : 515 seconds. Maximum altitude : 113.4 km. Downrange : 37 km from the launch site. This was the first successful attempt following two consecutive failures for the previous MOMO series, and has provided valuable telemetry data for further development within IST.

Mission Details

  • Launch date: May 4, 2019 at 08:45 PM UTC
  • Launch vehicle: MOMO v0
  • Operator: Interstellar Technologies
  • Launch site: Hokkaido Spaceport, Japan
  • Mission type: Suborbital